Proposal decisions
How to compare solar quotes
Compare proposals on the same facts. An isolated price cannot show whether equipment, scope, terms and responsibilities are equivalent.

Inputs that must match
Create one row per proposal and retain the version received. Before comparing, confirm the project type, consumption used, requested backup loads and proposal date. Differences can explain a different price without making one option automatically better.
Use the same fields for every proposal. If a field is absent, write pending instead of assuming a specification. This makes incomplete information visible and prevents comparing a battery with a whole system.
The publisher does not publish third-party quotes or rank companies. This worksheet prepares questions for the identified parties.
| Attribute | Quote A | Quote B | Quote C |
|---|---|---|---|
| Date and version | |||
| Panel and inverter model | |||
| Battery and backup scope | |||
| Included and excluded work | |||
| Total payment and terms | |||
| Warranty documents |
Equipment and installed scope
Record manufacturer and model of panels, inverter, battery, controls and backup equipment. A brand is not enough. Ask for quantities, intended location, included circuits and stated tasks such as permits or interconnection only where scope says so.
Distinguish capacity, power and projected production. A production projection relies on site assumptions; do not use it to conclude that two designs are equal. Review inverter compatibility and critical-load runtime as separate questions.
Do not normalize verbal sales statements as contractual scope. Request a written version before marking it confirmed.
Source: Solar and Resilience Basics
Warranties and responsible parties
For each proposal, record equipment warranty, installation warranty, service and any performance commitment in separate columns. Add document title and date, not merely a duration stated on a call.
Ask who is responsible for assessment, installation, permits, commissioning and claims. That allocation can matter as much as equipment. The warranty guide maps the document trail.
Total price and financing terms
Record stated total price, deposit, payments, term, rate or charge where documented, total paid over time and change conditions. Do not compare only a monthly payment or marketing number. Ask that each financing assumption be written and dated.
Keep incentives, credits and expected savings separate from contractual obligations. This guide does not give current incentive figures or individual eligibility. Appropriate financial or legal review may be needed for terms you do not understand.
- Written total price.
- Payment schedule and conditions.
- Documented financing assumptions.
- Fees, exclusions and scope-change terms.
Exclusions and unanswered questions
Read exclusions. Roof repair, electrical upgrades, civil work, monitoring, and later removal or reinstallation can be separate topics. Do not assume that included covers every project need.
Turn gaps into written questions. For utility process questions, use the interconnection responsibility guide as a question prompt, not a promise of approval or timeline.
Comparison checklist
Copy the worksheet, retain supporting documents and mark only answers supported by them. Then request clarification for the pending fields. A sound comparison holds assumptions constant and acknowledges genuine differences.
Also check who prepared each proposal and whether that party can answer for the scope written there. Do not mistake a manufacturer brochure for confirmation that a product, service or term is included. Keep responses with the proposal that prompted them so that conditions from separate options are not accidentally merged.
When a revised quote arrives, compare it against the prior version line by line and date the worksheet entry. A lower or higher total may reflect a changed model, a changed scope, or different payment assumptions. Mark the cause as unknown until the proposer provides a written explanation.
- Complete models and quantities.
- Included and excluded scope.
- Named responsible parties.
- Full price and payment terms.
- Attached warranty documents.
- Written answers to pending questions.
Download the UTF-8 CSV quote comparison worksheet (CSV, UTF-8)
Questions
Should I choose the lowest quote?
Not necessarily. First normalize models, scope, responsible parties, documents and total payment; one price figure does not establish equivalence.
Prepare a like-for-like comparison
Use a documented checklist to compare equipment, scope, warranties, payment terms and unresolved questions.
Review solar-provider questionsSources
- Solar and Resilience Basics — U.S. Department of Energy, 2026-11-15
- Tesla Powerwall Limited Warranty (USA) — Tesla, Inc., 2026-11-15